ULVAC DA-241 9.2 cfm Oil-Free Diaphragm Pump

$4,949.17

Manufactured and imported directly from Japan, ULVAC DA series diaphragm pumps creates vacuum by reciprocate movement of rubber diaphragms. Various pumping speed and two/single stages are selectable depends on your required pressure and pumping volume. These pumps are oil-free, which means less maintenance and no more frequent and costly oil change, or cross contamination. Ai is now the official dealer of ULVAC vacuum pumps. These pumps are made in Japan with one year warranty and technical support from ULVAC.

Product total
Options total
Grand total
SKU: 420190 Category: Brand:

Description

Manufactured and imported directly from Japan, ULVAC DA series diaphragm pumps creates vacuum by reciprocate movement of rubber diaphragms. Various pumping speed and two/single stages are selectable depends on your required pressure and pumping volume. These pumps are oil-free, which means less maintenance and no more frequent and costly oil change, or cross contamination.

Ai is now the official dealer of ULVAC vacuum pumps. These pumps are made in Japan with one year warranty and technical support from ULVAC.

Applications

  • Alcohol evaporation
  • Vacuum chucks, wafer and tip handling devices
  • Vacuum tweezers, medical appliances
  • Printing equipment
  • Automatic packing machines
  • Optical appliances
  • Semiconductor industry

 

Free three feet 3/8″ white premium food grade silicone vacuum tubing ($19.99 value) included.

 



 

 

Specifications

 

 Model ULVAC DA-241
 Electrical requirements
 110V 50/60Hz or 220V 50/60Hz single phase, 400 watts
 Full load current 6.0 amps
 Pumping rate
 9.2 cfm
 Ultimate vacuum level
 120 torr
 Inlet/Outlet
 5/8" hose barb
 Adjustable vac./gas ballast No
 Unit/shipping dimensions (LxWxH)
 8 x 16 x 11" / 18/11/14.5"
 Unit/shipping weight
 58 Lb / 63 Lb
 Working environment 32°F to 104°F (0°C to 40°C)
 Noise level 70 dBA at near Atmospheric pressure
 65 dBA at ultimate pressure
 Certification CE, TUV
Standard Packages

Standard package

 

 Part description

 Quantity

Part image

 ULVAC DA-241 9.2 cfm oil-free diaphragm pump
1 pc

 

 White premium food grade silicone vacuum hose (3 ft)
1 pc

 Power Cord with plug (may be hardwired to unit or with a detachable plug)
1 pc

 Threaded Hose Barbs (May be installed on the unit)
2 pc

 User's manual
1 pc

We Pride Ourselves on Excellent Customer Service

Our Customers Know The Difference.

Our clients look to us to provide reliable and efficient solutions.

★★★★★

SafeLeaf has always been great at sourcing our unique needs, Sean and the team are awesome.

Brent
Brent
Operations Manager
★★★★★

The team at Safe Leaf is very knowledgeable and helpful. I can't recommend them enough if you're in this space and need someone you can trust to help you solve whatever your problem is.

Lincoln Johnson
Lincoln
CEO/CTO — BC Extraction Facilty
★★★★★

Safe Leaf came through for us in the design and build of our extraction facility. I couldn't have asked for a better quality service or source of knowledge and insight.

Mike Hodgson
Mike H
Extraction Facility Operator
Frequently Asked Questions

Quick
Answers

SafeLeaf.ca carries a broad range of extraction and post-processing equipment including closed-loop hydrocarbon systems, CO₂ extractors, ethanol processors, rotary evaporators, falling film evaporators, wiped film distillation units, freeze dryers, vacuum ovens, and ancillary equipment. Browse the full catalogue or contact us for specific requirements.
Our primary market is Canadian processors. Some equipment can be sourced or referred for US-based operations, but regulatory and shipping considerations apply. Contact us to discuss your specific situation.
Yes. SafeLeaf.ca supports projects well beyond equipment sales, including planning, technical consulting, installation support, commissioning guidance, and broader turnkey implementation strategy.
Yes. Financing and leasing options may be available through partner channels, depending on the equipment package, customer profile, and project scope. This can make turnkey deployment much more accessible.
The best first step is a consultation. From there, SafeLeaf.ca can help define your extraction goals, recommend an appropriate workflow, identify compliance considerations, and shape a phased implementation plan.