Welch 1.6 CFM 38.3 L/Min WOB-L® Oil-Free Pump 2546

$1,469.74

*Note: Standard-duty dry pumps are not recommended for pumping organic, acidic, or basic vapors. WOB-L 2546 dry piston pumps are a reliable partners for physical applications, notably with aqueous solutions. Being a vacuum pump and compressor, they can be used for a wide variety of applications such as filtration, gas sampling, vacuum drying, desiccation and automation technology. The integrated vacuum and pressure gauges and regulators allow the pressure to be continuously monitored and adjusted.

Product total
Options total
Grand total
SKU: 2546 Category: Brand:

Description

*Note: Standard-duty dry pumps are not recommended for pumping organic, acidic, or basic vapors.

 

WOB-L 2546 dry piston pumps are a reliable partners for physical applications, notably with aqueous solutions. Being a vacuum pump and compressor, they can be used for a wide variety of applications such as filtration, gas sampling, vacuum drying, desiccation and automation technology. The integrated vacuum and pressure gauges and regulators allow the pressure to be continuously monitored and adjusted. The pump is protected by an inlet liquid trap with automatic flow stop.

 

Reliable WOB-L Piston pumps are perfect for many common laboratory vacuum applications. Features: Vacuum and Pressure – to 60 Torr (27.6″Hg). Includes Vacuum and Pressure Regulators and Gauges – simple to adjust and monitor vacuum level and delivery pressure. Inlet Water Trap – float ball rises to seal off pump from accidental ingestion of water. Muffler quiets pump and filters discharge air. For use with dry or aqueous vapor applications only.

 

For use with dry or aqueous vapor applications only.

 

Advantages: 

  • oil free
  • easy to clean
  • easy maintenance
  • easy handling and control features
  • robust construction

 

 

 

Specifications

Specification

 

Free Air Displacement @ 60 Hz, cfm (L/min)

1.6 (45)

Ultimate pressure in mbar (Torr)

60
Max Pressure, PSIG100
Motor Power, HP (kW) at 60 Hz1/4 (0.19)
Inlet (Exhaust) Connection Thread NPT1/4 (7)
Tubing Needed, I.D. in. (mm)1/4

Dimensions, LxWxH, in (mm)

10x7.5x9 (250x190x80)

Weight,s (kg)

13.8 (6.3)

 

   

 

   

 

   

 

Client Success Stories

Our Customers Know The Difference.

Our clients look to us to provide reliable and efficient solutions.

★★★★★

SafeLeaf has always been great at sourcing our unique needs, Sean and the team are awesome.

Brent
Brent
Operations Manager
★★★★★

The team at Safe Leaf is very knowledgeable and helpful. I can't recommend them enough if you're in this space and need someone you can trust to help you solve whatever your problem is.

Lincoln Johnson
Lincoln
CEO/CTO — BC Extraction Facilty
★★★★★

Safe Leaf came through for us in the design and build of our extraction facility. I couldn't have asked for a better quality service or source of knowledge and insight.

Mike Hodgson
Mike H
Extraction Facility Operator
Common Questions

Frequently
Asked.

SafeLeaf.ca carries a broad range of extraction and post-processing equipment including closed-loop hydrocarbon systems, CO₂ extractors, ethanol processors, rotary evaporators, falling film evaporators, wiped film distillation units, freeze dryers, vacuum ovens, and ancillary equipment. Browse the full catalogue or contact us for specific requirements.
Our primary market is Canadian processors. Some equipment can be sourced or referred for US-based operations, but regulatory and shipping considerations apply. Contact us to discuss your specific situation.
Yes. SafeLeaf.ca supports projects well beyond equipment sales, including planning, technical consulting, installation support, commissioning guidance, and broader turnkey implementation strategy.
Yes. Financing and leasing options may be available through partner channels, depending on the equipment package, customer profile, and project scope. This can make turnkey deployment much more accessible.
The best first step is a consultation. From there, SafeLeaf.ca can help define your extraction goals, recommend an appropriate workflow, identify compliance considerations, and shape a phased implementation plan.